Renovation PAF crane Tata Steel

At Tata Steel IJmuiden Bemo Rail  renovated the ground rail of the PAF crane during a stoppage of 72hour. The grouting of the rail was missing large portions and / or badly damaged, making recovery was necessary. The rail has been removed and inspected, after which new anchors are introduced in the existing foundation beam, the rail is replaced and new grouting has been applied.